Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: TRANSMISSION CONTAINER UNPACKING/PACKING
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-360-34-1 7-3.  TRANSMISSION CONTAINER UNPACKING/PACKING This task covers: a.  Upper Container Removal c.  Transmission Installation b.  Transmission Removal d.  Upper Container Installation Initial Setup: Equipment Conditions Materials/Parts Transmission prepared for storage (para 7-4). Lockwashers (8) (Item 108, Appendix F) Lockwashers (8) (Item 109, Appendix F) Tools and Special Tools Tool Kit, Genl Mech (Item 202, Appendix E) Sling Assembly (Item 160, Appendix E) Wrench, Torque, 0-175 Lb-Ft (Item 236, Appendix E) a. Upper Container Removal (1) Release air pressure at vent valve (1). (2) Remove 22 nuts (2), lockwashers (3), and screws (4).  Discard lockwashers. WARNING Keep   out   from   under   heavy   parts. Falling     parts     may     cause     serious injury or death to personnel. (3) Attach  suitable  lifting  device  and  remove upper  container  (5)  from  lower  container (6). Change 1  7-3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business