Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-360-34-1 17-2.  WINCH REPLACEMENT (CONT) NOTE Wires    can    be    installed    on    either, terminal. (10) Connect wires (13) to solenoid (14). (11) Connect two hoses (15) on counterbalance valve (16). NOTE Do step (12) for left side only. (12) Install grab  handle  (17)  on  winch  platform (18)   and   winch   assembly   (1)   with   four screws (19) and new locknuts (20). c. Follow-On Maintenance (1) Install control console panels (TM 9-2320-360-20). (2) Install chock block stowage box (TM 9-2320-360-20). (3) Install winch cable (TM 9-2320-360-20). 17-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business