| |
TM 9-2320 -356-BD
HOSE
SEALING COMPOUND
4.
Repeat steps 2 and 3 for other end of hose.
5.
Record the BDAR action taken.
When the mission is completed, as soon as
practicable, repair using standard maintenance procedures.
Option 6:
High-Pressure Line Repair (Hose and Tube Splice).
Procedural Steps:
1.
Install adapter in hose. Refer to option 3 or 5.
2.
Squarely cut
3.
Flare end of
4.
Connect hose
end of tubing.
tube and remove
and tube.
Slide tube nut over tube,
burrs.
5.
Record the BDAR action taken.
When the mission is completed, as soon as
practicable,
repair using standard maintenance procedures.
3-30
|