| |
TM 9-2320-356-BD
Option 3:
Swage Sleeves.
1.
Splice the cable with two metal sleeves.
2.
Swage the sleeves on the cables with installation tool, a vise, or a hammer.
3.
Adjust cable to its proper tens ion.
4.
Record the BDAR action taken.
When the miss ion is completed, as soon as
practicable, repair using standard maintenance procedures.
3-22.
CLEVIS, COTTER, DOWEL, QUICK-RELEASE, OR AL INEMENT PIN MISSING
Most linkages have retainer devices, cotter keys, lacing wire, or safety p ins to
keep the connecting nuts, bolts, or pins in place. During BDAR repairs, wire,
welding rod, bolts, or nails can be used to secure connecting nuts, bolts, or
pins.
Place the item through the hole and bend the ends to keep it from falling
out .
Alinement pins or dowels can be replaced with cut bolts. Use a bolt that is
a tight fit in the hole, wedge the bolt in, and cut to proper length.
3-17
|