TM 9-2320-356-BD
7.
Slide outer insulating sleeve into place. If flexible tubing is used, tie both
ends with nylon braid or cord.
8.
Record the BDAR action taken.
When the mission is completed, as soon as
practicable, repair using standard maintenance procedures.
Option 3:
Insulated Crimp Splices.
1.
Prepare the severed ends of the cable for pigtail method of shield termination.
2.
Use the insulated splice connector to join the inner conductors.
3.
Use two splice connectors to
extension to complete the shield
add a short length
connection.
of insulated wire as an
4.
Cover area with tape or vinyl sleeve.
5.
Record the BDAR action taken.
When the mission is completed, as soon as
practicable, repair using standard maintenance procedures.
8-8
|