Click here to make tpub.com your Home Page

Page Title: REMOVAL - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-312-24-1
AC COMPRESSOR REPLACEMENT - CONTINUED
0155 00
REMOVAL - CONTINUED
NOTE
AC compressor mounting bracket has slotted mounting holes to allow for adjustment when installed. This
adjustment ensures proper serpentine belt alignment. Note position of bracket prior to removal to ensure cor-
rect installation.
6.
Remove four bolts (11), washers (12), lockwashers (13), and bracket (9) with AC compressor (15) from engine. Discard
lockwashers.
7.
Remove four nuts (10), bolts (14), and AC compressor (15) from bracket (9).
11,12,13
9
10
14
16
15
INSTALLATION
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Failure to follow this warning may result in injury to personnel.
1.
Install AC compressor (15) to bracket (9) with four bolts (14) and nuts (10).
2.
Install bracket (9) with AC compressor (15) to right side of engine with four new lockwashers (13), washers (12), and
bolts (11). Do NOT fully tighten bolts.
NOTE
Apply refrigerant oil to preformed packings of AC hoses before they are connected. DO NOT reuse pre-
formed packings.
3.
Connect two AC hoses (16) to AC compressor (15).
4.
Position engine serpentine belt (WP 0012 00). Check belt for square alignment. Belt should be vertically straight and
perpendicular with frame.
5.
Fully tighten four bolts (11).
0155 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business