Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-312-24-1
AC EXPANSION VALVE REPLACEMENT - CONTINUED
0151 00
INSTALLATION - CONTINUED
2.
Connect two hoses (4) to expansion valve (6) and tighten two fitting nuts (4).
3.
Install mounting plate with thermostatic switch to expansion valve (6) (WP 0058 00).
3.1.
Remove all traces of caulk from front panel (2) and heater/AC unit and apply new caulk.
4.
Install front panel (2) to heater/AC unit with five screws (1).
4.1.
Connect fresh/recirculate air control cable (2.1) to front panel (2).
5.
Close heater/AC unit access door (3).
2
1
2.1
3
6.
Replace receiver-drier (WP 0154 00).
7.
Place battery disconnect switch in ON position.
8.
Charge air conditioning system (WP 0149 00).
9.
Leak test air conditioning system (WP 0057 00).
END OF WORK PACKAGE
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business