Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-312-24-1
VOLTAGE REGULATOR REPLACEMENT - CONTINUED
0091 00
INSTALLATION
1.
Install voltage regulator (2) on alternator (8) with two new lockwashers (7) and screws (6). Tighten screws to 75 lb-in
(8.5 Nm).
2.
Connect connector (3) to voltage regulator (2).
3.
Install wire (1) to terminal of voltage regulator (2) with new lockwasher (5) and new locknut (4). Tighten locknut to 30
lb-in (3.4 Nm).
4.
Apply one or more coats of insulating varnish to terminal lug connection.
2
1
3
6,7
2
8
4,5
5.
Connect battery cables (WP 0115 00).
6.
Lower cab (TM 9-2320-312-10).
END OF WORK PACKAGE
0091 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business