|
|
TM 9-2320-312-24-1
ETHER COLD START SYSTEM MAINTENANCE - CONTINUED
0077 00
ELECTRONIC CONTROL RELAY REMOVAL - CONTINUED
3.
Remove four nuts (11), bolts (12), and electronic control relay (7) from bracket (10).
11,12
10
7
ELECTRONIC CONTROL RELAY INSTALLATION
1.
Install electronic control relay (7) to bracket (10) with four bolts (12) and nuts (11).
2.
Connect two relay harness connectors (8) to ether cold start system harness connectors (9).
3.
Place battery disconnect switch in ON position. Lower cab (TM 9-2320-312-10).
4.
Install left-front mudflap (WP 0048 00).
0077 00-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |