|
|
TM 9-2320-312-24-1
FRONT AND REAR AIRBRAKE CHAMBERS REPLACEMENT
THIS WORK PACKAGE COVERS
Front Airbrake Chamber: Removal, Installation
Rear Airbrake Chamber: Removal, Installation
INITIAL SETUP
Materials/Parts
Maintenance Level
Unit
Compound, pipe sealing (Item 20, WP 0165 00)
Detergent (Item 23, WP 0165 00)
MAC Reference
Group 080 and Group 090
Tag, marker (Item 58, WP 0165 00)
RPSTL Reference
Equipment Condition
Group 080, Figure 1
Wheels blocked
Group 090, Figure 1
Air system drained (TM 9-2320-312-10)
Tools and Special Tools
Cab tilted, if replacing front airbrake chamber (TM
9-2320-312-10)
Tool kit, general mechanic's (Item 35, WP 0166 00)
Brakes caged, if replacing rear airbrake chamber
Shop equipment, common no. 1 (Item 28, WP 0166
(TM 9-2320-312-10)
WARNING
DO NOT disconnect any air lines or fittings unless engine is shut down and air system pressure is relieved.
Failure to follow this warning could result in serious injury to personnel.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |