TM 9-2320-304-14&P
5-228
Direct Support and General Support Maintenance (Cont)
5-43. CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT).
(1) Measure and mark five new screw hole positions (1) on right-side frame rail (2).
(2) Drill five 0.781-in. (19.84 mm) holes in right-side frame rail (2).
(3) Measure and mark five new screw hole positions (3) for stowage box bracket on left-side frame
rail (4).
(4) Drill five 0.781-in. (19.84 mm) holes in left-side frame rail (4).
(5) Measure distances shown and mark positions.
(6) Drill two 0.531-in. (13.49 mm) holes (5) in right-side battery box bracket (6) and one 0.531-in.
(13.49 mm) hole (7) in left-side battery box bracket (8) as shown.
Change 1
|