| |
TM 9-2320-304-14&P
5-218
Direct Support and General Support Maintenance (Cont)
5-41. LOAD HANDLING SYSTEM (LHS) LOAD CONTROL VALVE MAIN FRAME
REPLACEMENT.
This task covers:
a. Removal
b. Installation
c. Follow-on Maintenance
INITIAL SETUP
Special Tools
Tool Kit, General Mechanics, Item 32,
Appendix B
Pan, Drain 4 gal, Item 16, Appendix B
Wrench, Combination 1-1/2 in.,
Item 39, Appendix B
Wrench, Torque (0-175 lb-ft. [0-237 NSm]),
Item 48, Appendix B
Supplies
Oil, Hydraulic, Item 12, Appendix F
Lockwasher (4), Item 17, Appendix K
Preformed Packing Kit, Item 40,
Appendix K
Personnel Required
MOS 63W, Wheel vehicle repairer
Equipment Condition
TM or Para
Condition Description
TM 9-2320-279-10 Engine OFF
TM 9-2320-279-10 Wheels chocked
References
None
Models
M1120
Test Equipment
None
Special Environmental Conditions
None
General Safety Instructions
None
|