Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-on Maintenance
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-304-14&P 5-126 Direct Support and General Support Maintenance (Cont) 5-25.   LOAD HANDLING SYSTEM (LHS) MAIN FRAME TUBE REPLACEMENT (CONT). WARNING Main frame and hook arm combined weight is 2,100 lbs. (953 kg). Hook arm cylinders weigh 210 lbs. (95 kg) each. Attach suitable lifting device prior to installation to prevent possible injury to personnel. (12)Attach lifting device to main frame (3). CAUTION Do not allow wooden blocks supporting main frame to fall when main frame is lifted, or damage to equipment may result. (13)   With the aid of another soldier, press main frame safe lowering button while using lifting device to raise main frame (3). (14)   Remove wooden blocks and then lower main frame (3). (15)   Remove lifting device from main frame (3). (16)   Install LHS control box cover (27), four lockwashers (28), and screws (29) on bracket (30). c. Follow-on Maintenance    Remove wheel chocks (TM 9-2320-279-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business