| |
TM 9-2320-304-14&P
5-114
Direct Support and General Support Maintenance (Cont)
5-24. LOAD HANDLING SYSTEM (LHS) MAIN FRAME REPAIR (CONT).
NOTE
Apply light coat of grease to outer edges of
seals prior to installation.
(4) Install four seals (6) in main frame (4).
(5) Install two lube fittings (7) in main
frame (4).
e. Installation.
WARNING
Main frame weighs 1,000 lbs. (454 kg).
Attach suitable lifting device prior to
installation to prevent possible injury to
personnel.
(1) Attach lifting device to main frame (1).
(2) With the aid of another soldier and
using lifting device, position main
frame (1) on truck.
WARNING
Use care when installing retaining rings.
Retaining rings are under tension and can
act as projectiles when released causing
injury to personnel.
NOTE
Coat pivot pin with grease prior to
installation.
(3) With the aid of another soldier, install
two pivot pins (2), shims (3), and
retaining rings (4) on main frame (1).
(4) Block main frame (1) up in two places so
that front of main frame is 30 to 35 in.
(76 to 89 cm) above compression frame
where rubber bumpers are mounted.
|