| |
TM 9-2320-304-14&P
Organizational Maintenance Instructions (Cont)
b. Assembly.
NOTE
Perform step (1) if inserts were removed.
(1)
Install two inserts (1) in relay mount
bracket (2).
(2)
Install five socket modules (3), one
bracket (4), and two screws (5) to relay
mount bracket (2).
(3)
Install relay mount bracket (2), two
lockwashers (6), and screws (7) to
control box (8).
(4)
Install relay socket module (9) with
screw (10) and locking nut (11).
(5)
Install relays R51 (12), R52 (13),
R53 (14), R54 (15), R55 (16) to five relay
socket modules (3).
(6)
Install relay R56 (17) to relay socket
module (9).
c. Follow-on Maintenance. Install CHU box
wiring (Para 4-34.2).
END OF TASK
Change 1
4-170.11/(4-170.12 blank)
|