| |
TM 9-2320-304-14&P
4-170.10
Organizational Maintenance Instructions (Cont)
4-34.3 CONTAINER HANDLING UNIT (CHU) CONTROL BOX REPAIR (CONT).
(3)
Remove locking nut (9), relay socket
module (2), and screw (10). Discard
locking nut.
(4)
Remove two screws (11),
lockwashers (12), and relay mount
bracket (13) from control box (14).
Discard lockwashers.
(5)
Remove two screws (15), bracket (16),
and five relay socket modules (8) from
relay mount bracket (13). Discard
lockwashers.
NOTE
Perform step (6) if inserts are damaged.
(6)
Remove two inserts (17) from relay
mount bracket (13).
Change 1
|