| |
TM 9-2320-304-14&P
5-272
Direct Support and General Support Maintenance (Cont)
5-43. CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT).
NOTE
Make sure rear sliders are deployed in
step (23).
(23) Start engine (TM 9-2320-279-10).
CAUTION
Engine speed must be at idle before using
hydraulic selector switch, or damage to
equipment may result.
(24) Set hydraulic selector switch (12) to
AUTO (Para 2-9).
NOTE
LHS may be extended approximately 12 in.
(30 cm) after hook arm cylinder stops and
main frame cylinder extends to make
measurement in step (27) easier.
(25) Extend hook arm cylinder (13) until
hook arm cylinder stops and main
frame cylinder (14) start to move.
(26) Shut OFF engine (TM 9-2320-279-10).
NOTE
·
If measurement in step (27) is 77
±0.25 in. (196 ±0.6 mm), go to
step (32).
·
If measurement in step (27) is not 77
±0.25 in. (196 ±0.6 mm), perform
steps (28) through (30).
(27) With the aid of Soldier B, measure
distance between centers of two hook
arm cylinder pivot pins (15).
Change 1
|