| |
TM 9-2320-304-14&P
5-266
Direct Support and General Support Maintenance (Cont)
5-43. CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT).
(216) Connect MC82 connector (218) to LHS
main control box (219).
NOTE
Installation of left-side and right-side container guides is the same. Left side is shown.
(217) Install container guide (220) with pin (221) and lock pin (222) on stowage tray (44).
Change 1
|