Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-303-24-2
AIR CONDITIONER HOSE REPLACEMENT - CONTINUED
0305 00
INSTALLATION - CONTINUED
3.
Lubricate new preformed packing (5) with refrigerant oil and install.
4.
Apply loctite to male threads (6) and connect each end of hose.
5
6
5.
Tighten connections (WP 0311 00).
6.
Apply insulation tape at each end of hose connection.
7.
Wrap remainder of hose with strip caulk.
8.
Service air conditioner compressor (WP 0301 00).
9.
Charge air conditioning system (WP 0297 00).
WARNING
Refrigerant R-134a air conditioning systems should not be pressure tested or leak tested with compressed
air. Combustible mixtures of air and R-134a may form, resulting in a fire or explosion, which could cause
personnel injury or death.
10.
Leak test air conditioning system (WP 0218 00).
END OF WORK PACKAGE
0305 00-3/4 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business