|
|
TM 9-2320-303-24-2
FRAME RAIL EXTENSION AND REINFORCEMENT REPLACEMENT - CONTINUED
0278 00
INSTALLATION
16.
Install six washers (1), six capscrews (20), six washers (7), and six nuts (8).
17.
Tighten nuts (8 and 19).
18.
Install clamp (6) and nut (5) on power steering reservoir plate (3).
2
22
1
5
21
6
20
3
19
18
4
7
17
16
8
15
9
14
10
12
13
11
19.
Install power steering reservoir and hoses (WP 0159 00).
20.
Install transmission oil cooler (WP 0114 00).
21.
Install front crossmember (WP 0277 00).
22.
Install front spring hangers (WP 0283 00).
23.
Install front engine mount support (WP 0279 00).
END OF WORK PACKAGE
0278 00-5/6 blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |