|
|
TM 9-2320-303-24-2
TRANSMISSION OVERHAUL - CONTINUED
0248 00
MODULE OVERHAUL - CONTINUED
P2 Planetary Module Assembly
1.
If removed, replace bushing (6) into P2 planetary carrier (2) using a press and tool (J37036). Press new bushing flush to
0.016 in (0.40 mm) below surface.
2.
Install two bearing assemblies (10) into center of pinion gear (9). Install thrust washers (8 and 11) inside P2 planetary
carrier (2), align thrust washer tangs with slots in planetary, and retain them with petrolatum. Slide pinion gear and bear-
ing assemblies into side of P2 planetary carrier between thrust washers. Repeat procedure for remaining five pinion
gears.
3.
Install four pinion spindles (7) so that lower step is positioned for proper installation of indexing ring (12).
4.
5.
Measure pinion end play. Pinion end play must not exceed 0.037 in (0.94 mm). Check all four pinion gears.
6.
Install P3 planetary ring gear (4) over P2 planetary carrier assembly (2).
7.
Install retaining ring (1) into P3 planetary ring gear (4) so that P2 planetary carrier and P3 planetary ring gear are assem-
bled.
8.
Install thrust bearing (5) on planetary module (3).
1
3
2
13
4
12
2
6
5
11
10
7
9
8
0248 00-36
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |