|
|
TM 9-2320-303-24-2
TRANSMISSION OVERHAUL - CONTINUED
0248 00
MODULE OVERHAUL - CONTINUED
P2 Planetary Module Disassembly
1.
Remove retaining ring (1) and P3 planetary ring gear (4) from planetary module (3). Remove and inspect thrust bearing
(5).
2.
Check P2 planetary carrier assembly (2) for pinion end play. Pinion end play must not exceed 0.037 in (0.94 mm).
Check all six pinion gears.
3.
Remove internal retaining ring (13), indexing ring (12), and four pinion spindles (7) from P2 planetary carrier (2).
4.
Remove pinion gear (9), thrust washers (8 and 11), and two bearing assemblies (10) from side of P2 planetary carrier
(2). Repeat procedure for remaining pinion gears.
5.
Measure thickness and step wear of thrust washers (8 and 11). Minimum thrust washer thickness allowed is 0.055 in
(1.40 mm). Maximum step wear allowed is 0.005 in (0.12 mm).
6.
Inspect and measure bushing (6) inside P2 planetary carrier (2) for wear or damage. Maximum ID allowed is 2.096 in
(53.23 mm). If bushing is worn, remove and replace.
7.
Check spline wear of P2 planetary carrier (2) and P3 planetary ring gear (4). Maximum allowed spline wear is 0.015 in
(0.38 mm).
1
3
2
13
4
12
2
6
5
11
10
7
9
8
0248 00-35
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |