Click here to make tpub.com your Home Page

Page Title: P2 Planetary Module Disassembly
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-303-24-2
TRANSMISSION OVERHAUL - CONTINUED
0248 00
MODULE OVERHAUL - CONTINUED
P2 Planetary Module Disassembly
1.
Remove retaining ring (1) and P3 planetary ring gear (4) from planetary module (3). Remove and inspect thrust bearing
(5).
2.
Check P2 planetary carrier assembly (2) for pinion end play. Pinion end play must not exceed 0.037 in (0.94 mm).
Check all six pinion gears.
3.
Remove internal retaining ring (13), indexing ring (12), and four pinion spindles (7) from P2 planetary carrier (2).
4.
Remove pinion gear (9), thrust washers (8 and 11), and two bearing assemblies (10) from side of P2 planetary carrier
(2). Repeat procedure for remaining pinion gears.
5.
Measure thickness and step wear of thrust washers (8 and 11). Minimum thrust washer thickness allowed is 0.055 in
(1.40 mm). Maximum step wear allowed is 0.005 in (0.12 mm).
6.
Inspect and measure bushing (6) inside P2 planetary carrier (2) for wear or damage. Maximum ID allowed is 2.096 in
(53.23 mm). If bushing is worn, remove and replace.
7.
Check spline wear of P2 planetary carrier (2) and P3 planetary ring gear (4). Maximum allowed spline wear is 0.015 in
(0.38 mm).
1
3
2
13
4
12
2
6
5
11
10
7
9
8
0248 00-35

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business