Click here to make tpub.com your Home Page

Page Title: FLOOR MATS REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-303-24-1
FLOOR MATS REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Maintenance Level
Equipment Condition
Seats removed (WP 0186 00)
Unit
Seat belt tether belts removed (WP 0187 00)
Tools and Special Tools
ABS ECU cover removed (WP 0104 00)
Tool kit, general mechanic's (Item 102, WP 0313
Shift tower removed (WP 0107 00)
Fire extinguisher bracket removed (WP 0196 00)
Wrench set, socket attachment (Item 114, WP 0313
Radio bracket removed (if installed)
REMOVAL
1.
Remove nine screws (1), two treadplates (2), floor mats (3), and insulation pads (4) from cab.
2.
Remove 10 torx screws (5), washers (6), and floor mat (7) from cab.
1
1
5, 6
3,4
2
7
INSTALLATION
1.
Install floor mat (7) with 10 washers (6) and torx screws (5).
2.
Install two insulation pads (4), floor mats (3) and treadplates (2) on cab with nine screws (1).
3.
Install seat belt tether belts (WP 0187 00).
4.
Install radio bracket.
5.
Install shift tower (WP 0107 00).
6.
Install fire extinguisher bracket (WP 0196 00).
7.
Install seats (WP 0186 00).
8.
Install ABS ECU cover (WP 0104 00).
END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business