Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-303-24-1
REAR HUB, DRUM, WHEEL BEARINGS, AND SEAL REPLACEMENT - CONTINUED
0155 00
INSTALLATION - CONTINUED
NOTE
During step 13, it may be necessary to tighten adjusting nut to align protrusion with alignment hole in lock
ring.
14.
Install lock ring (12) on axle spindle (1).
15.
Install jamnut (11) on axle spindle (1). Tighten jamnut to 250-400 lb-ft (339-542 Nm).
1
2
3
4
5
6
7
16
4
14
13
12
11
8
9
10
402-405
ADJUSTMENT (END PLAY)
1.
Attach dial indicator magnetic base to hub (5).
2.
Adjust dial indicator so plunger is against spindle (1) end.
3.
Position dial indicator parallel to axis of spindle (1).
4.
Grasp hub (5) at 3 and 9 o'clock positions.
5.
Push and pull hub (5) in and out while rotating hub approximately 45 degrees.
6.
Note end play while rotating hub (5) until dial indicator tip is in same position before rotation began.
7.
Acceptable end play is .001 - .005 inches.
8.
If end play is not within tolerance, loosen jamnut (12) and either back off or tighten adjusting nut (14) as required.
9.
Repeat steps 1 through 7 until acceptable end play is achieved.
10.
Apply a bead of adhesive on inner circumference of axle shaft (10).
NOTE
Splines on axle shaft must engage in differential before axle flange will seat against hub.
11.
Install axle shaft (10) with eight washers (9) and nuts (8). Tighten nuts to 155 lb-ft (210 Nm).
12.
Install brake drum (7) on hub (5).
0155 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business