Click here to make tpub.com your Home Page

Page Title: PRIMARY I AIR TANK AND FITTINGS REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-303-24-1
PRIMARY I AIR TANK AND FITTINGS REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Equipment Condition
Maintenance Level
Unit
Air system drained (TM 9-2320-303-10)
Tools and Special Tools
Rear platform removed (WP 0172 00)
Tool kit, general mechanic's (Item 102, WP 0313
References
Materials/Parts
TM 9-2320-303-10
Compound, pipe, sealing (Item 17, WP 0312 00
Tags, marker (Item 42, WP 0312 00)
REMOVAL
NOTE
Tag all tubes prior to disconnecting to aid in connecting.
1.
Disconnect two tubes (8) from air tank (10).
2.
Remove four nuts (1), four washers (2), and air tank (10).
2
1
1
2
8
10
8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business