|
|
TM 9-2320-302-20-2
STORAGE BOX LATCH REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Tools and Special Tools
Materials/Parts
Tool kit, general mechanic's (Item 50, WP 0306 00)
Compound, caulking (Item 10, WP 0305 00)
Nut, lock (P/N M45913/1-4CG5C) (4)
REMOVAL
1.
Remove caulking compound from nuts (4) and circumference of latch (3).
2.
Remove four locknuts (4), washers (1), and latch (3) from storage box door (2). Discard locknuts.
2
1
3
4
INSTALLATION
1.
Install latch (3) on storage box door (2) with four washers (1), and new locknuts (4).
2.
Apply a bead of caulking compound to circumference of latch (3).
3.
Cover locknuts (4) and threads with caulking compound.
END OF WORK PACKAGE
0259 00-1/(-2 Blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |