|
|
TM 9-2320-302-20-2
SHIFT TOWER MAINTENANCE (M916A3, M917A2)
THIS WORK PACKAGE COVERS
CTIS Control Panel Replacement, Shift Selector Replacement, Transfer Case (All-Wheel Drive) Switch Replacement,
Shift Tower Replacement
INITIAL SETUP
Equipment Condition
Tools and Special Tools
Tool kit, general mechanic's (Item 50, WP 0306 00)
Master battery switch in OFF position (TM 9-2320-
302-10)
Materials/Parts
References
Washer, lock (P/N MS35338-44) (3)
TM 5-3805-264-14&P
TM 9-2320-302-10
NOTE
M917A2 shift tower is illustrated.
CTIS CONTROL PANEL REPLACEMENT
1.
Disconnect wiring harness connector (8) from CTIS control panel (4).
2.
Remove screw (7), lockwasher (6), and ground lead (5). Discard lockwasher.
3.
Remove two screws (3), two lockwashers (2), and CTIS control panel (4) from shift tower (1). Discard lockwashers.
4.
Position CTIS control panel (4) on shift tower (1).
5.
Install two new lockwashers (2) and two screws (3).
6.
Install ground lead (5), new lockwasher (6), and screw (7).
7.
Connect wiring harness connector (8) to CTIS control panel (4).
2
1
3
4
5
6
8
7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |