|
|
TM 9-2320-302-20-2
RADIATOR REPLACEMENT - CONTINUED
0052 00
REMOVAL - CONTINUED
NOTE
Remove tiedown straps, as necessary.
9.
Lift radiator (16) from vehicle and remove two isolators (22) and washers (26). Place radiator in safe area.
10.
Remove four locknuts (27) and mounting plate (28) from radiator (16). Discard locknuts.
11.
Remove two screws (20), washers (21), and plate (29) from mounting plate (28).
12.
Remove two locknuts (30), screws (15), washers (34), and air line support (17) from radiator (16). Discard locknuts.
16
18
15
19
34
17
33
32
20
31
30
21
29
28
27
22
23
24
26
25
INSTALLATION
NOTE
Install new tiedown straps, as necessary.
1.
Install air line support (17) on radiator (16) with two washers (34), screws (15), and new locknuts (30).
2.
Loosely install plate (29) on mounting plate (28) with two washers (21) and screws (20).
3.
Install mounting plate (28) on radiator (16) with four new locknuts (27).
0052 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |