Click here to make tpub.com your Home Page

Page Title: SECURING WINCH WIRE ROPE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-273-10
High speed winch operation is recommended for paying
out line or taking up slack only.
e. To run the winch in high speed, push down and hold winch control lever no. 2.
This will double the winch speed.
f. When the desired amount of line has been paid out, stop the winch by releasing
both control levers.
SECURING WINCH WIRE ROPE
a. Direct a crew member to disconnect the wire rope from the payload.
b. With crew member pulling on the wire rope to keep it fairly taut, start rewinding
the drum by pushing down on winch control lever no. 1.
c. Check that the wire rope winds neatly onto the drum without tangling, kinking,
twisting or overlapping. Make sure that the coils on the drum are tight and close
together.
d. Direct crew member to signal when enough slack has been taken up to anchor
the clevis.
e. Have the crew member anchor the line clevis.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business