|
|
TM 9-2320-273-10
2-18. Loading (M916 and M920 Only).
PREPARATION FOR LOADING
a. Aline your tractor and semitrailer as close as possible to the front of the payload
equipment.
b. Place the transmission ratio selector in neutral (N).
c. Apply the parking brakes.
d. Prepare the semitrailer for loading.
NOTE
Loading procedures will vary depending on the size and
type of equipment to be transported.
WARNING
Hearing protection is required during winding operations.
The M916 and M920 are each equipped with a full hydraulic winch mounted on the
frame behind the cab as shown below. The winch has a fail-safe spring-loaded brake
which will automatically set any time the winch control valve is in neutral or in case
of power failure (hydraulic pressure drops to less than 200 psi). The winch operates
at 2100 psi hydraulic pressure from a dual pump which is driven by a power takeoff
on the transmission. The rated capacity of the winch is 45,000 Ibs (20,250 kg).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |