|
|
TM
5-2420-224-34
PAVEMENT BREAKER REPAIR (CONT)
29. INSTALL new packing (49) and quick-disconnect coupling HALF (50).
30. INSTALL new packing (51) and quick-disconnect coupling HALF (52).
31. INSTALL new packing (53) and HOSE assembly (54).
32. INSTALL new packing (55) and HOSE assembly (56).
33. INSTALL four side rod NUTS (57) and TIGHTEN in 20 Ib-ft (25 N.m) increments to 75 Ib-ft (100 N.m).
34. CHARGE ACCUMULATOR using Charging procedure, below.
35. INSTALL valve CAP (58), new packing (59), and valve CAP (60).
21-35
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |