|
|
TM 5-2420-224-34
PAVEMENT BREAKER REPAIR (CONT)
NOTE
A c c u m u l a t o r cylinder (45) may
r e m a i n in handle if accumulator
charge is below 20 psi (1.4 bar).
28. PLACE 3/4-hex deep socket with 6-in. (15-cm)
EXTENSION over charging valve (44) and
TAP EXTENSION with PLASTIC or RUBBER
hammer to REMOVE ACCUMULATOR
assembly (13) and automatic body (31).
29. REMOVE and DISCARD PACKING (41) from
automatic body (31).
30. IF accumulator CYLINDER (45) is still in
handle assembly (30), INSTALL PULLER KIT
and remove accumulator CYLINDER (45).
31. REMOVE and DISCARD PACKING (46) from
accumulator cylinder (45).
WARNING
W h e n discharging nitrogen from
a c c u m u l a t o r , stand to one side
a n d keep face away from front
of charging valve to prevent
p e r s o n a l injury.
3 2 . DISCHARGE remaining NITROGEN from
accumulator assembly (13).
21-28
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |