Click here to make tpub.com your Home Page

Page Title: PAVEMENT BREAKER REPAIR-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
PAVEMENT BREAKER REPAIR (CONT)
WARNING
W h e n discharging nitrogen from
a c c u m u l a t o r , stand to one side
a n d keep face away from front
of charging valve to prevent
personal injury.
LOOSEN charging VALVE (11) 1-1/2 turns,
6.
R E M O V E valve CAP (12), and DRAIN
ACCUMULATOR assembly (13) to 20 psi
(1.4 bar).
7.
REMOVE four side rod NUTS (14).
REMOVE FOOT assembly (15) by TAPPING
8.
with RUBBER or PLASTIC hammer.
REMOVE lock nut (16), washer (17), bushing
9.
(18), bolt (19), latch (20), detent PLUNGER
(21), spring (22), bushing (23), and washer
(24). DISCARD lock NUT.
10.
REMOVE and DISCARD PACKING (25), cup
SEAL (26), and WIPER (27).
NOTE
Hexagon bushing is tapered
toward  flange  end  of  foot
assembly.
11. USING 50-ton PRESS, REMOVE hexagon
BUSHING (28).
21-25

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business