Click here to make tpub.com your Home Page

Page Title: CHARGING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
5-2420-224-34
HAMMER
DRILL
REPAIR
(CONT)
1.
Remove plug (1).
2.
Rotate gage end of test set fully to left to
make sure stem is fully retracted.
Install test set in handle of hammer drill (2)
3.
by rotating chuck end only.
4.
Rotate gage end of test set slowly to right
until pressure is indicated on gage. Pressure
reading should be 500-700 psi (34-48 bar).
5.
Connect nitrogen supply line (3) to charging
valve (4) on test set.
Adjust regulator (5) on nitrogen bottle (6) to
6.
delivery pressure of 600 psi (42 bar).
7.
Open valve (7) on nitrogen supply line (3).
When accumulator is fully charged, close
8.
valve (7) on nitrogen supply line (3) and
disconnect from test set.
Rotate gage end of test set fully to left and
9.
remove tester at chuck end.
10.
Install plug (1).
TESTING
Perform steps 1 thru 4 of Charging, above.
1.
2.
If pressure is low, charge accumulator using
Charging procedure, above.
Rotate gage end of test set fully to left and
3.
remove tester at chuck end.
4.
Install plug (1).
21-14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business