Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
CRANE
VERTICAL
OUTRIGGER
CYLINDER
REPAIR
(CONT)
7.
INSTALL new lock RING (23) in piston (22).
8.
USING SPANNER WRENCH, INSTALL
P I S T O N (22) on rod assembly (19) and
TIGHTEN to 250 Ib-ft (339 N.m).
INSTALL ROD assembly (19) in crane vertical
9.
outrigger cylinder (11 ).
10. USING SPANNER WRENCH, THREAD HEAD
(16) into crane vertical outrigger cylinder (11)
and TIGHTEN to 250 Ib-ft (339 N.m).
NOTE
Follow-on Maintenance:
I n s t a l l crane vertical outrigger
cylinder (TM 5-2420-224-20).
20-242

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business