|
|
TM 5-2420-224-34
CRANE
VERTICAL
OUTRIGGER
CYLINDER
REPAIR
(CONT)
REMOVE valve BODY (17) from valve block
9.
(15).
10.
REMOVE and DISCARD PACKING (18), two
backup RINGS (19 and 20), two PACKINGS
(21 and 22), and backup RING (23) from
valve body (17).
ASSEMBLY
NOTE
Procedure is the same for both
vertical outrigger cylinders.
Apply coat of lubricating oil to
p a c k i n g s , O-rings, and seals
prior to assembly.
1.
INSTALL new backup RING (1), two new
P A C K I N G S (2 and 3), two new backup
RINGS (4 and 5), and new PACKING (6) on
valve body (7).
2.
INSTALL valve BODY (7) in valve block (8).
3.
I N S T A L L three new packings (9), valve
BLOCK (8), and six capscrews (10) on crane
vertical outrigger cylinder (11).
20-240
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |