|
|
TM 5-2420-224-34
CRANE
INNER
BOOM
LIFT
CYLINDER
REPAIR
(CONT)
4.
U S I N G suitable PRESS, INSTALL two
BUSHINGS (10) in crane inner boom lift
cylinder (8).
I F REMOVED, INSTALL new lubrication
5.
FlTTING (11) in rod assembly (12).
6.
U S I N G suitable PRESS, INSTALL two
BUSHINGS (13) in rod assembly (12).
7.
INSTALL new SEAL (14), new WIPER (15),
new backup RING (16), and new O-RING (17)
on head (18).
20-216
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |