Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
VALVE
REPAIR
(CONT)
NOTE
Steps 1 and 2 are the same for all flow regulating valves.
Apply coat of lubricating oil to O-rings prior to assembly.
1.
INSTALL new O-RING (1), new backup RING (2), new O-RING (3), new backup RING (4), new
backup RING (5), and new O-RING (6) on flow regulating valve body (7).
2.
INSTALL flow regulating VALVE (8) in valve body (9).
NOTE
Steps 3 and 4 are the same for both globe valves.
INSTALL new O-RING (10), new backup RING (11), new O-RING (12), and new backup RING (13) on
3.
g l o b e valve body (14).
4.
INSTALL globe VALVE (15) in valve body (9).
NOTE
Steps 5 thru 7 are the same for both solenoid valves.
INSTALL new O-RING (16), new backup RING (17), new O-RING (18), new backup RING (19), new
5.
backup RING (20), new O-RING (21), and new backup RING (22) on solenoid valve (23).
INSTALL solenoid VALVE (23) in valve body (9).
6.
7.
INSTALL COIL (24) and nut (25).
INSTALL DIODE assembly (26) on coil (24).
8.
NOTE
Follow-on Maintenance:
Install forklift valve (page 11-37).
Bleed forklift lift cylinder (page 11-51).
Fill front and rear hydraulic tanks (LO 5-2420-224-12).
20-179

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business