Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
BACKHOE BOOM CYLINDER REPAIR (CONT)
INSTALL new PACKING (9), new retainer
4.
(10), and two new wear rings (11) on piston
(12).
INSTALL PISTON (12) on piston rod (8).
5.
WARNING
Adhesive causes immediate
bonding on contact with eyes,
skin, or clothing and also gives
off  harmful  vapors.  Wear
p r o t e c t i v e goggles and use in
w e l l - v e n t i l a t e d area. If adhesive
g e t s in eyes, try to keep eyes
o p e n ; flush eyes with water for
1 5 minutes and get immediate
m e d i c a l attention.
APPLY COAT of SEALING COMPOUND to
6.
T H R E A D S of screw (13) and INSTALL
SCREW (13) and washer (14) on piston rod
( 8 ) . TIGHTEN SCREW to 475-525 Ib-ft
(644-712 N.m).
INSTALL piston ROD (8) in tube (15).
7.
USING spanner WRENCH, THREAD
8.
RETAINER (5) into tube (15) and TIGHTEN to
100-200 Ib-ft (135-271 N.m).
INSTALL self-tapping SCREW (16).
9.
NOTE
Follow-on Maintenance:
I n s t a l l backhoe boom cylinder
(TM 5-2420-224-20).
20-104

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business