Click here to make tpub.com your Home Page

Page Title: ASSEMBLY-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
BACKHOE CONTROL VALVE, BOOM SECTION VALVE REPAIR (CONT)
3.
lNSTALL new packing (6) and new SEAL (7).
TAP SEAL with soft-faced hammer until it is
even with the top.
4.
INSTALL POPPET (8) and spring (9).
5.
INSTALL new PACKING (10).
INSERT FABRICATED TOOL into both slots
6.
on load check plug (11) and INSTALL load
check PLUG (11) in valve body (12).
7.
TURN valve BODY (12) over and REPEAT
STEPS 4 thru 6 for other load check plug
hole.
20-65

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business