Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
BACKHOE CONTROL VALVE, SWING SECTION VALVE REPAIR (CONT)
15. lNSTALL three new packings (28, 29, and 30)
and safety relief VALVE (31) and TIGHTEN to
65-85 lb-ft (85-115 N.m).
16. REPEAT STEP 15 for opposite safety relief
valve (32).
17.
INSTALL SPRING (33) In valve disc (34) by
turning spring (33).
18.
INSTALL spring (33) and valve DISC (34) in
valve body (12).
19.
INSTALL new packing (35) and PLUG (36).
20.
REPEAT STEPS 17 thru 19 for plug (37).
21.
PERFORM safety relief VALVE TESTING and
ADJUSTMENT (page 20-69).
NOTE
Follow-on Maintenance:
Install swing section valve in
backhoe control valve (page
20-58

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business