Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
5-2420-224-34
BACKHOE CONTROL VALVE REPAIR (CONT)
INSTALL two shims (13), four new packings
6.
(14), and swing section VALVE (15).
7.
INSTALL two shims (16), four new packings
(17), and intake MANIFOLD (18).
NOTE
B e f o r e tightening nuts, be sure
equal amount of threads are
exposed on both ends of rods.
INSTALL four NUTS (19) on four rods (2).
8.
TIGHTEN eight NUTS (1 and 19) to 20-30
Ib-ft (27-41 Nm).
NOTE
Follow-on Maintenance:
Install backhoe control valve (page
20-46

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business