Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
TILT AND LATCH CONTROL VALVE REPAIR (CONT)
28. INSTALL new packing (48) and plug COCK
(49).
29. INSTALL four new PACKINGS (50).
INSTALL four tie RODS (51) and four new
30.
nuts (52) through ail four valve sections.
TIGHTEN NUTS to 288 lb-in. (32.5 Nm).
NOTE
Follow-on Maintenance:
Install tilt and latch control valve
Adjust tilt and latch control valve
pressure settings (page 11-5).
20-40

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business