Click here to make tpub.com your Home Page

Page Title: Solenoid-Operated Front Loader/Forklift Valve Body Disassembly-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
FRONT LOADER/FORKLIFT CONTROL VALVE REPAIR (CONT)
REMOVE eight capscrews (18), two HEADS (19), and six packings (20 and 21). DISCARD
PACKINGS.
REMOVE two springs (22), two washers (23), and SPOOL (24).
REMOVE cylinder lock valve (25), two packings (26), and RAM (27) from valve body (28). DISCARD
PACKINGS.
REMOVE cap (29), packing (30), spring (31), and POPPET (32) from valve (25). DISCARD PACKING.
TURN valve BODY (28) OVER and REMOVE load check plug (33), packing (34), spring (35), and
PISTON (36). DISCARD PACKING.
20-25

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business