Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
5-2420-224-34
AIR BRAKE BOOSTER REPAIR (CONT)
5.
INSTALL CASE (12) and spring (13).
INSTALL FLANGE (3) in case (12) and line
6.
up hole in flange (3) with hole in case (12).
INSTALL end of retaining WIRE (14) in hole
of flange (3) and ROTATE FLANGE (3) to
right until retaining wire (14) is completely
installed.
7.
INSTALL SCREW (15) and washer (16).
8.
INSTALL new VALVE (17).
INSTALL new SPRING (18), new packing (19),
9.
thrust piece (20), and new retaining ring (21).
NOTE
Follow-on Maintenance:
Install air brake booster (TM 5-
2420-224-20).
17-27

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business