Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
OIL PAN REPLACEMENT (CONT)
CAUTION
M a k e sure all gasket material has been removed from all mating surfaces to
p r e v e n t damage to equipment.
4.
INSTALL two new GASKETS (18 and 20). APPLY ADHESIVE to ENDS of gaskets.
NOTE
Make sure ends of two gaskets (18 and 20) are coated with adhesive and in contact
with two gaskets (19 and 21).
INSTALL two new GASKETS (19 and 21).
5.
6.
INSTALL oil PAN (17), 4 nuts (12), 2 screws (13), 2 washers (16), 2 long screws (15), and 16 screws
(14).
INSTALL BRACKET (17) and bolt (10).
7.
INSTALL new packing (9), guide TUBE (8), clamp (7), bolt (5), washer (6), and nut (4).
8.
INSTALL spacer (3), cap (2), and gage ROD (1).
9.
NOTE
Follow-on Maintenance:
Install engine (page 3-2).
Install accelerator pedal and linkage (engine linkage only) (TM 5-2420-224-20)
13-59

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business