Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
CRANE EXTENSION BOOM REPLACEMENT (CONT)
With friction linings installed, measure height of friction lining above level surface of extension boom.
Thickness of friction lining above metal surface should not be less than 0.04-0.06 in. (0.1-0.2 cm). If
measurement is less, replace friction lining.
INSTALL two friction LININGS (1).
1.
2.
USING suitable HOIST, carefully SLIDE extension BOOM (2) into outer boom (3).
NOTE
Follow-on Maintenance:
Install crane external end extension cylinder (TM 5-2420-224-20).
Install crane hook assembly (TM 5-2420-224-20).
12-18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business