|
|
TM 5-2420-224-34
CRANE MAST REPLACEMENT AND REPAIR (CONT)
1.
INSTALL two hose GUARDS (1).
I N S T A L L four hose GUARDS (2), four
2.
capscrews (3), and four new lock nuts (4).
CAUTION
Feed hoses through hose
g u a r d s of base weldment very
carefully. Failure to do so could
result in damage to hoses.
NOTE
Make sure cover is installed over
notch in base weldment.
INSTALL base WELDMENT (5), cover (6), 18
3.
washers (7), and 18 new capscrews (8).
INSTALL hose GUARD (9) and two spring
4.
pins (10).
IF REMOVED, INSTALL two new lubrication
5.
FlTTINGS (11) in mast weldment (12).
IF REMOVED, INSTALL two new lubrication
6.
FlTTlNGS (13) in two pins (14).
7.
INSTALL mast WELDMENT (12), two pins
(14), two new lock washers (15), and two
capscrews (16).
12-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |