Click here to make tpub.com your Home Page

Page Title: REMOVAL-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
CRANE MAST REPLACEMENT AND REPAIR (CONT)
R E M O V E two capscrews (31), two lock
9.
w a s h e r s (32), two pins (33), and mast
WELDMENT (34). DISCARD lock WASHERS.
I F DAMAGED, REMOVE two lubrication
10.
FlTTINGS (35) from two pins (33).
I F DAMAGED, REMOVE two lubrication
11.
FITTINGS (36) from mast weldment (34).
REMOVE two spring pins (37) and hose
12.
GUARD (38).
CAUTION
Feed  hoses  through  hose
g u a r d s of base weldment very
carefully.  Failure to do so
could  result  in  damage  to
hoses.
REMOVE 18 capscrews (39), 18 washers
13.
(40), cover (41), and base WELDMENT (42).
DISCARD CAPSCREWS.
REMOVE four lock nuts (43), four capscrews
14.
(44), and four hose GUARDS (45). DISCARD
lock NUTS.
15.
REMOVE two hose GUARDS (46).
12-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business