Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
BACKHOE MAIN FRAME REPLACEMENT AND REPAIR (CONT)
INSTALL DIPPER, BOOM, and swing TOWER assembly (6), spacer (7), pin (8), and nut (9).
3.
4.
INSTALL shim (10), PIN (11), washer (12), capscrew (13), and new lock nut (14).
NOTE
Follow-on Maintenance:
Install
backhoe stabilizer control valve (page 11-12).
Install
backhoe control valve (page 11-15).
Install
pintle assembly (TM 5-2420-224-20).
Install
backhoe control tower (TM 5-2420-224-20).
Install
backhoe swing cylinders (TM 5-2420-224-20).
Install
backhoe stabilizers (TM 5-2420-224-20).
12-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business